Casino Bern
General renovation of the Casino Bern building, originally inaugurated in 1909.
Information Sheet
Renovation/Transformation Casino Bern www.casinobern.ch
Location Bern, Switzerland.
Project Cost 74 million CHF (approx. 68 million € according to the opening year's conversion rate).
Time Frame Feasibility study: 2015. Design: 2016-2017. Construction: 2018-2019. 0pening: September 2019.
Owner City of Bern, Switzerland.
Architect(s) CampanileMichetti Architekten, Bern cmarchitekten.ch
Theatre Planner(s) Frans Swarte, Stefan Abromeit, The Space Factory, Lyon, France thespacefactory.net
Seat Count The historic “Grosser Saal”, a 1 300-seat performance hall for classical concerts, conferences, amplified concerts and private events (with a flat floor option); the smaller 300-seat “Burgerratssaal” chamber music hall, restaurant, foyers, and musicians' practice rooms. Total area (net): 9 000 m².
Uses Concerts and banquets.
Services Full-service acoustics consulting for all the halls.
Team Evan Green, Eckhard Kahle, Kahle Acoustics.